StandardRICS POMI
RegionInternational and the Gulf
Published byRICS
In BillMate 1.0Section template

Prepare a POMI bill of quantities

POMI is the short international rule set behind a great many Gulf contracts, and it ships in BillMate as a work-section template with the AI instructed in its conventions.

Implementation status
RICS POMI ships as a section template in BillMate 1.0. A new project can start from the RICS POMI template, and the template also tells the AI assistant how to word and measure items. BillMate helps you produce a bill structured for RICS POMI; it does not certify compliance, and the surveyor remains responsible for the measurement.

What POMI is

The RICS Principles of Measurement (International) for Works of Construction is a deliberately brief document, and that brevity is why it travels. Where a national method of measurement runs to hundreds of pages of specific rules, POMI states general principles and short trade rules, leaving the particulars to the contract's preambles. It is widely specified across the Gulf, and in Hong Kong and Singapore.

Its practical consequence for a surveyor is that the preamble does the work. Because POMI itself says less, what a rate is deemed to include is far more often defined in the bill's own preliminaries than in the rule set. A POMI bill lives or dies on descriptive precision.

How BillMate handles it

The RICS POMI template, as it ships
  1. 1 Preliminaries
  2. 2 Demolition & Site Clearance
  3. 3 Earthwork
  4. 4 Piling
  5. 5 Concrete Work
  6. 6 Masonry
  7. 7 Metalwork
  8. 8 Woodwork
  9. 9 Thermal & Moisture Protection
  10. 10 Doors, Windows & Glazing
  11. 11 Finishes
  12. 12 Furniture & Equipment
  13. 13 Mechanical Installations
  14. 14 Electrical Installations
  15. 15 External Works & Drainage

The fifteen sections BillMate creates from the POMI template. Note that Piling has a section of its own, which is characteristic of the markets POMI is used in.

What it still does not do. BillMate does not check your measurement against POMI, and it holds no library of standard POMI descriptions. It structures and prices the bill; the measurement and the preambles are yours.

A practical note on the Gulf

If you work between markets — a POMI bill this month, an NRM2 bill next — BillMate holds both projects on the same install with different currencies, different section structures and one shared rate library. The library keeps each rate's locality, so a Dubai rate and a Lagos rate never quietly get mistaken for one another.

The UAE and Gulf market page works all of this through in dirhams: a piling take-off, a hot-weather concrete build-up, a POMI bill and the summary arithmetic with a VAT line on it.

POMI also carries the weight in markets whose own rules are not templated. Neither Ghana nor Kenya has a national method of measurement in BillMate, and on internationally procured work in both countries POMI is what the bill is measured to anyway — so it is the template those two market pages point at, and they say plainly what you do for work in local format.

Keep reading

Related pages

Structure a RICS POMI bill and price it from your own rates.

Free on 2 projects, with no sign-up.