MarketKenya
Templates that fitPOMI or trades
CurrencyKES (KSh)
Free tier2 projects

Price a Kenyan bill in shillings, on your own machine

Take off walls in machine-cut stone, build a rate that carries the hoop iron and the hoisting, keep a Nairobi rate apart from a Mombasa one, and issue the document — offline, for one payment.

Read this first
No Kenyan method of measurement ships as a template. Every other market hub on this site is backed by a template for that market's own rules. Kenya is not, and pretending otherwise would be the exact thing we say we do not do. What does ship is RICS POMI — 15 work sections, with the AI instructed in its conventions — which is genuinely what donor-funded and internationally procured work in Kenya is measured to. For work in local format, you start from the generic Trades or Elemental template and build the sections yourself. That is a real answer, and it is a smaller one than the other market pages can give. It is the whole reason this page exists and the Ghana one does, and Tanzania and Uganda do not.

The short answer

If the measurement rules are the only thing you were shopping for, the paragraph above is your answer and you can stop reading. If what you actually need is somewhere to keep dimensions, build shilling rates you can defend, and produce a bill that does not fall apart on the third revision, keep going — because none of that depends on which template you started from.

BillMate is for the sole practitioner, the small consultancy and the contractor's estimator. It runs offline, holds your projects on your own device, and costs one payment rather than an annual per-seat renewal.

What ships for Kenya
Kenyan method of measurement templateNo
RICS POMI template15 sections
Editable Trades and Elemental templatesYes
ShillingSupported
Tax line on the summaryVAT, at the rate you set
Licence₦39,999 once, 3 devices

Building the bill structure yourself, in about ten minutes

This is the part that replaces the template you do not get, and it is genuinely not onerous — a section in BillMate is just an element or a trade, the level a client reads sub-totals at.

Start a project from Trades (generic), which arrives as a trade-by-trade breakdown with no standard attached. Rename the sections to the headings your bills actually use, add the ones that are missing, reorder them with the arrows in each section header, and delete what you do not need. Every one of those operations is free on the 2-project tier, and deleting asks first and then offers an undo.

Then set it as your default section template in settings, and every new project starts in your own shape rather than someone else's. The one thing to be clear-eyed about: this gives you the structure. It does not instruct the AI assistant in Kenyan measurement conventions the way selecting BESMM4 or POMI instructs it in theirs, because there is no rule set behind it for the AI to be instructed in.

And the standing caveat, which is not specific to Kenya. BillMate does not check your measurement against any method of measurement, templated or not. It structures and prices the bill. The measurement, and responsibility for it, stay with the surveyor. How we handle standards generally.

Taking-off

Walls off a plan, on the centre-line girth.

The technique is the same everywhere. What changes here is what the wall is made of.

Walling in 200 mm machine-cut stone blocks — item 2.04
Dimension sheet: timesing, dimensions, squared quantity and description for each measurement.
Times Dimensions Squaring Description
  46.80
2.90
135.72 External walls, storey height, floor level to underside of ring beam. Centre-line girth 46.80 — the 47.60 external perimeter less one wall thickness at each of four corners.
7/ 1.20
1.20
10.08 Deduct seven window openings, 1200 × 1200. Timesing 7/.
  1.50
2.40
3.60 Deduct the main entrance opening.
2/ 0.90
2.10
3.78 Deduct two external door openings.
Cast into the bill 118.26

An external perimeter of 47.60 is not the length of the wall: measured on its centre line a rectangle loses one wall thickness at each of its four corners, so 47.60 becomes 46.80 before anything is multiplied by anything. The sheet keeps the working, so a query six months later is answered by opening it rather than by measuring the job again. The full walkthrough, including measuring on screen from an image of the drawing.

A shilling rate, built

The arithmetic behind one square metre of stone.

Kenya builds its walls out of quarried stone, cut to size by machine. Almost nowhere else does, and the rate shows it.

Walling in 200 mm machine-cut stone blocks in cement mortar 1:4 — unit rate per m²
Unit rate build-up for Walling in 200 mm machine-cut stone blocks in cement mortar 1:4: constituent, quantity, unit, unit cost and amount, with percentage additions.
Constituent Quantity Unit Cost Amount
Material Machine-cut stone blocks 200 × 200 × 400 — 12.5 per m², including 5% breakage 13.13 nr KSh 95 KSh 1,247.35
Material Cement for mortar 1:4, including waste 0.28 bag KSh 850 KSh 238
Material Building sand, screened 0.04 KSh 3,200 KSh 112
Material Hoop iron reinforcement in alternate courses 1.20 m KSh 28 KSh 33.60
Material Water, curing and cleaning down 1.00 item KSh 35 KSh 35
Labour Mason — set, level, joint and point 1.10 hr KSh 420 KSh 462
Labour Labourer — mix mortar, hoist and load out 1.40 hr KSh 250 KSh 350
Plant Scaffold and hoisting, apportioned 1.00 KSh 140 KSh 140
Net costKSh 2,617.95
Overheads and establishment charges, 10%KSh 261.80
Profit and risk, 15% on net cost plus overheadsKSh 431.96
Unit rate per m²KSh 3,311.71

Illustrative constituent costs for Nairobi, 25 August 2026. These are an illustration of the method and are not current market prices — re-price every line against your own quarry and suppliers before use. BillMate's default 10% overheads and 15% profit are applied here; if your bill prices preliminaries and profit separately, set them to zero or you will recover them twice.

Look at what dominates: the stone itself, at roughly half the rate before additions, which is why the quarry you buy from moves this item more than the gang you use to lay it. The hoop iron line is the one a surveyor from another market would miss entirely — thin galvanised strip built into alternate courses, cheap per metre and universal here. Note too that this is a rate per square metre of wall, so the block size is in the description rather than the arithmetic. The same trade in a market that bills by volume is a structurally different rate — here is that version.

What comes out

The measured bill, in shillings.

Continuous with everything above it: item 2.04 carries the quantity the dimension sheet cast and the rate the build-up arrived at.

Bill no. 2 — Substructure and walling, extract
Proposed maisonette, Ruiru, Kiambu County — measured to RICS POMI
Item Description Unit Qty Rate Amount
2.01 Excavate foundation trench not exceeding 1.50 m deep; cart away surplus excavated material 46.80 KSh 1,240 KSh 58,032
2.02 Approved hardcore filling in 200 mm layers, well rammed and consolidated, blinded with murram 28.40 KSh 2,180 KSh 61,912
2.03 Vibrated reinforced concrete class 20/20 in strip foundations and ground beams 22.60 KSh 18,400 KSh 415,840
2.04 Walling in 200 mm machine-cut stone blocks in cement mortar 1:4, with hoop iron reinforcement in alternate courses 118.26 KSh 3,311.71 KSh 391,642.82
2.05 High tensile steel bar reinforcement, cut, bent and fixed in position including binding wire kg 1840.00 KSh 168 KSh 309,120
2.06 Damp-proof membrane, 1000 gauge polythene sheeting laid on blinding with 300 mm laps 96.40 KSh 1,420 KSh 136,888
2.07 Provisional sum for connection to mains water and sewer, to be expended as directed sum 1 KSh 480,000 KSh 480,000
Carried to collection KSh 1,853,434.82
From your rate library AI estimate — verify before issue Keyed by hand

Illustrative project and illustrative rates. Note the units this market bills in — reinforcement by the kg rather than the tonne, and hardcore and murram filling measured by volume. One rate is an AI draft and is marked as one, on screen and on the exported document, which also counts them. The same page for three markets.

Cities

A Nairobi rate is not a Mombasa rate, and sometimes not even the same item.

Distance from the quarry, distance from the port and distance from the sea all move the number, and the last of those moves the specification as well.

Nairobi and KiambuSitting in the quarry belt, so machine-cut stone is at its cheapest and its most available here, and the subcontract market is the deepest in the country. This is the station most other rates end up being compared against.
Mombasa and the coastSalt exposure changes the specification before it changes the rate — cover, galvanising and waterproofing all move — so a coastal item is often genuinely not the same item as its up-country equivalent, and averaging the two produces a figure that is true nowhere.
Kisumu and the lake regionA thinner subcontract market means fewer tenderers and more spread between them, and long hauls for anything not made locally land in the material component rather than the labour one.
Nakuru and EldoretRift Valley stone and murram are close to hand and price accordingly, but skilled trades are often brought up from Nairobi with accommodation carried in the rate — a difference that lives in labour, not materials.

General observations about how these markets differ, not price data. BillMate publishes no Kenyan rate index — your library is the price basis, and we explain why.

Your rates, kept straight

Every rate knows its town, its month and where it came from.

A Kenyan rate library, working extract
Rate library extract: description, unit, rate, location, month priced, source and currency status.
Description Unit Rate Location Priced Source Status
Walling in 200 mm machine-cut stone blocks, cement mortar 1:4 KSh 3,311.71 Nairobi — Ruiru 2026-06 Own build-up Current
Ditto, same specification KSh 3,684 Mombasa 2026-05 Priced tender Current
Vibrated reinforced concrete class 20/20 in foundations KSh 18,400 Nairobi — Ruiru 2026-06 Priced tender Current
Approved hardcore filling, rammed and consolidated KSh 2,180 Nakuru 2026-04 Subcontract quote Current
Damp-proof membrane, 1000 gauge polythene sheeting KSh 1,420 Nairobi — Ruiru 2026-06 AI draft Unverified
High tensile steel reinforcement, cut, bent and fixed kg KSh 168 Kisumu 2024-10 Priced tender Stale

The first two rows are the same walling specification priced in Nairobi and Mombasa, and they sit side by side rather than averaging into a number that is true in neither. One entry is an unverified AI draft and says so. One is flagged stale at 12 months. Illustrative rates, not market evidence — how the library works.

Be realistic about this

Where BillMate fits Kenyan practice, and where it does not.

A good fit

  • Sole practitioners and small consultancies whose alternative today is a spreadsheet, and who cannot justify a per-seat annual licence in shillings.
  • Contractors’ and subcontractors’ estimators pricing a bill that arrived as a PDF and needing build-ups that survive a post-tender interview.
  • Donor-funded and internationally procured work, where POMI is the rule set and it ships as a template with the AI instructed in it.
  • Practices working across the region — a shilling project, a cedi project and a naira project on one install, with nothing converted between them.
  • Working offline, on site or anywhere the connection is not worth relying on.

A poor fit

  • Anyone who needs a Kenyan measurement template out of the box. There is not one. You get POMI, or you build the structure yourself — said at the top of this page for a reason.
  • Drawing- and model-led measurement at volume. Measurement is from an image of a drawing, not from a PDF, a CAD file or an IFC model.
  • Contract administration. No interim certificates, no valuations, no variation register, no final account.
  • Published cost data. Nothing bundled, for this market or any other. Your rates or nothing.
  • Multi-surveyor teams editing one live bill. Projects live on the device that made them, and there is no synchronisation.
What it costs

₦39,999 once, or nothing at all for 2 projects.

No subscription, no renewal date, no per-seat fee and no sales call.

Free
₦0

2 active projects. Taking-off, rate build-ups, provisional and prime cost sums and the whole rate library. No sign-up, no card. You cannot export the bill.

Start 2 projects free
Pro licence — one-time
₦39,999

One authorised user, up to 3 devices. Unlimited projects, client-ready PDF and CSV export, on-screen measurement, AI assistance, core updates to version 1.x.

Buy Pro — ₦39,999
Team pack — one-time
₦149,999

Up to 5 authorised users and 10 devices on one shared licence key. Everything in the Pro licence. Each person works on their own projects; there is no simultaneous collaborative editing.

Buy Team — ₦149,999

On the price: Charged in naira at Selar checkout. This page shows the Africa price because you are reading the Africa page, and both buttons open the Africa product — nothing here is chosen from your IP address. Other regions, and the region selector, are on the pricing page. The amount you pay is the amount shown at checkout before you confirm. In KES: Selar shows this converted into KES at checkout rather than in NGN, and a converted figure moves with the rate — so the amount on the checkout page is the one that governs, and we publish no KES figure here that could go stale. Kenyan cards are accepted. On VAT: BillMate applies one tax line to the sub-total after preliminaries and contingency, at whatever rate you type. It does not know your tax position and does not try to work it out.

Before you invest an afternoon

What BillMate does not do.

AI drafts; the surveyor verifies.
Every AI-generated rate is marked on screen and counted on the exported document. An AI rate is a starting point for your judgement, never a verified market price.
On-screen measurement works on an image, not a file.
Load a photo, screenshot or exported page of the drawing and set the scale from one known dimension. BillMate does not read PDFs or CAD files directly, and there is no BIM or IFC model take-off. If your work is model-led, you need a package built for that.
Your data lives on your device.
There is no cloud copy. If the device is lost, the projects are lost with it. BillMate reminds you to back up after 14 days; take the reminder seriously.
No synchronisation between devices.
Devices on one licence do not share projects automatically. You move work with a backup file. Rate libraries merge on restore rather than overwrite.
Not an enterprise system.
There is no multi-user editing, no procurement workflow, no valuations module and no ERP integration. It is a tool for one surveyor at a time.
No Kenyan measurement template.
RICS POMI ships and the generic Trades and Elemental templates are editable, but there is no preset for Kenyan measurement conventions and the AI is not instructed in them. This is the one limitation on this page that other market pages do not share.
Choose your market Sets the currency, the terminology and the measurement standard shown to you. Nothing is chosen for you from your IP address, and you can always read the global pages.

Every market above has a page of its own, and two of them say plainly that no national method of measurement ships for them — see what "localised" means here.

Price a job you have already priced, and compare.

2 projects free, no sign-up, and the whole rate library included.