MarketUnited Kingdom
StandardsNRM1 and NRM2
Licence$59 once
Free tier2 projects

Prepare NRM1 cost plans and NRM2 bills without a per-seat licence

Both RICS rule sets ship as templates. Take off on a dimension sheet, build rates you can defend at a valuation, and keep London and Manchester apart in one rate library — offline, on your own machine, for one payment.

No sign-up for the free tier. No sales call, no procurement cycle, and no renewal date.

The short answer

If you are a sole practitioner, a two-partner practice, or a contractor's estimator, the established measurement packages are priced for a consultancy with a procurement department. Their strength is drawing- and model-led measurement at volume. If that is your work, buy one — we say so on the comparison page.

BillMate is for the rest of it: turning a measure you already have into a properly structured cost plan or measured bill, to the RICS rules, without an annual per-seat renewal. NRM1 and NRM2 both ship as section templates, and the one you select also instructs the AI assistant in that rule set's conventions.

What ships for the UK
RICS NRM1 elemental template8 group elements
RICS NRM2 measured-works template15 work sections
AI instructed in the selected rule setBoth
SterlingSupported
Licence$59 once, 3 devices
NRM1 — before there is anything to measure

An order of cost estimate, built elementally.

The stage where you need a defensible number and the drawings are nowhere near detailed enough to measure. Group elements, £/m² against GIFA, and the additions kept visible rather than smeared into the rates.

Elemental cost plan — order of cost estimate
ProjectProposed three-storey speculative office, Greater Manchester
GIFA1,850 m²
BasisRICS NRM1
Cost limit£4,288,006.84
NRM1 elemental cost plan: group element, cost, cost per square metre of gross internal floor area, and share of building works.
Gp Group element Cost £/m² %
0 Facilitating works
1 Substructure £312,000 £168.65 10.4
2 Superstructure £1,184,000 £640.00 39.7
3 Internal finishes £268,000 £144.86 9.0
4 Fittings, furnishings & equipment £74,000 £40.00 2.5
5 Services £962,000 £520.00 32.2
6 Prefabricated buildings
8 External works £186,000 £100.54 6.2
Building works estimate £2,986,000 £1,614.05 100.0
Main contractor's preliminaries 12% £358,320 £193.69
Main contractor's overheads and profit 6% £200,659.20 £108.46
Project and design team fees 12% £425,397.50 £229.94
Risk allowances 8% £317,630.14 £171.69
Cost limit, excluding inflation £4,288,006.84 £2,317.84

Illustrative figures for a speculative office in Greater Manchester, 25 August 2026 — an illustration of the method, not a benchmark. Every addition compounds on the running total in NRM1's order, and each is calculated rather than typed, so changing the preliminaries percentage moves everything below it. BillMate holds no BCIS or other published cost data: the £/m² has to be yours. You would round the cost limit for presentation, of course — the pence are shown here only to make the point that the figure is calculated rather than typed.

NRM2 — once there is

A unit rate you can defend at a valuation.

Constituent by constituent, with the waste in the quantity and the additions applied where a checker can see them.

In-situ reinforced concrete C32/40 in ground beams — unit rate per m³
Unit rate build-up for In-situ reinforced concrete C32/40 in ground beams: constituent, quantity, unit, unit cost and amount, with percentage additions.
Constituent Quantity Unit Cost Amount
Material Ready-mixed concrete C32/40, delivered — including 3% waste 1.03 £132 £135.96
Material Part-load surcharge and waiting-time allowance 1.00 item £6.50 £6.50
Material Curing and protection allowance 1.00 item £2.20 £2.20
Labour Gang — ganger and two labourers, place and compact 0.75 hr £96 £72
Plant Poker vibrator — hire and fuel 0.35 hr £4.80 £1.68
Net cost£218.34
Overheads and establishment charges, 10%£21.83
Profit and risk, 15% on net cost plus overheads£36.03
Unit rate per m³£276.20

Illustrative constituent costs, Greater Manchester, 25 August 2026 — re-price every line against your own supply chain. One thing to watch under NRM2: BillMate's default 10% overheads and 15% profit are set for markets where those are carried in the rates. If you are pricing preliminaries and OH&P separately, as an NRM2 bill normally does, set both to zero here or you will recover them twice.

Note what is not in this build-up: no cement, no aggregate, no mixer. Concrete arrives ready-mixed and the risk moves from batching to part-loads and waiting time, so those get their own lines. The same item in a market where it is batched on site is a structurally different rate — here is that version. A rate library that cannot tell those apart is not a rate library.

Taking-off

The working stays behind the quantity.

Timesing for repeats, deductions for openings, squaring calculated. Six months later a query is answered by opening the sheet rather than re-measuring.

Facing brickwork in outer skin of cavity wall — measured to an elevation
Dimension sheet: timesing, dimensions, squared quantity and description for each measurement.
Times Dimensions Squaring Description
2/ 9.60
5.40
103.68 Front and rear elevations, dpc to eaves. Timesing 2/ — both are identical.
2/ 6.20
5.40
66.96 Gable ends, ditto.
6/ 1.20
1.35
9.72 Deduct six window openings, 1200 × 1350.
  2.10
2.10
4.41 Deduct the patio door opening.
  0.90
2.10
1.89 Deduct the front door opening.
Cast into the bill 154.62

Whether a small opening is deducted at all is a question for NRM2 and for the preambles on your bill — not for the software. BillMate does the arithmetic you ask for; it does not decide the rule. The full walkthrough, including measuring on screen from an image of the drawing.

What comes out

The measured bill, in sterling.

Continuous with everything above it: item 2.03 carries the rate the build-up arrived at, and 2.06 carries the quantity the dimension sheet cast.

Bill no. 2 — Substructure, extract
Proposed three-storey speculative office, Greater Manchester — RICS NRM2
Item Description Unit Qty Rate Amount
2.01 Excavating to reduce levels, maximum depth not exceeding 2.00 m 386.00 £14.80 £5,712.80
2.02 Disposal of excavated material off site, including all charges 386.00 £22.40 £8,646.40
2.03 In-situ reinforced concrete C32/40 in ground beams; poured against faces of excavation 74.00 £276.20 £20,438.80
2.04 Sawn formwork to sides of ground beams, height not exceeding 500 mm 168.00 £47.10 £7,912.80
2.05 High-yield reinforcement bars, cut, bent and fixed, including tying wire and spacers t 5.80 £1,485 £8,613
2.06 Facing brickwork in outer skin of cavity wall, PC £680/1000, in gauged mortar; flush pointed 154.62 £92.40 £14,286.89
Carried to collection £65,610.69
From your rate library AI estimate — verify before issue Keyed by hand

Illustrative project and rates. Note what is not in these rates: preliminaries and main contractor's overheads and profit, which an NRM2 bill prices separately — the same point the build-up above warns about. One rate is an AI draft and is marked; the exported document counts it. The same page for three markets.

Regions

A London rate is not a Leeds rate, and your library should know it.

UK quantity surveyors have applied regional location factors for decades. The adjustment is only as good as the base rate it adjusts, and a library that has forgotten where its rates came from cannot be adjusted at all.

One library, locality on every rate
Rate library extract: description, unit, rate, location, month priced, source and currency status.
Description Unit Rate Location Priced Source Status
Facing brickwork in outer skin of cavity wall, PC £680/1000 £92.40 Manchester 2026-06 Priced tender Current
In-situ reinforced concrete C32/40 in ground beams £276.20 Manchester 2026-06 Own build-up Current
Ditto, same specification £341.75 London EC2 2026-05 Priced tender Current
Sawn formwork to sides of ground beams £47.10 Leeds 2026-03 Subcontract quote Current
High-yield reinforcement, 16 mm, cut, bent and fixed t £1,485 Manchester 2024-09 Priced tender Stale

Two entries here are the same specification priced in different cities, and they sit side by side rather than averaging into a number that is true nowhere. One is flagged stale at 12 months. Illustrative rates, not market evidence — how the library works.

Be realistic about this

Where BillMate fits a UK practice, and where it does not.

A good fit

  • Sole practitioners and small practices priced out of a per-seat annual licence, where the alternative today is a spreadsheet.
  • Contractors’ estimators who receive a bill and need to price it properly, with build-ups that survive a post-tender interview.
  • Early-stage cost planning — an NRM1 order of cost estimate does not need drawing-led measurement to be useful.
  • Anyone who already measures elsewhere and needs the billing, pricing and issuing end. Plenty of surveyors run a take-off package alongside this.
  • Working offline — on site, on a train, in a basement plant room.

A poor fit

  • Drawing- and model-led measurement at volume. BillMate measures from an image of a drawing, not from a PDF, a CAD file or an IFC model. If that is the core of the job, buy a measurement package.
  • Multi-surveyor teams editing one live bill. Projects live on the device that made them.
  • Published cost data. No BCIS, no SPON’s, nothing bundled. Your rates or nothing.
  • Formal cost management — no valuations, no CVR, no change control. It prepares documents; it does not administer contracts.
  • One small bill a year. Your spreadsheet is fine, and we argue that case honestly.
What it costs

$59 once, or nothing at all for two projects.

No subscription, no renewal date, no per-seat fee and no sales call.

Free
$0

2 active projects. Taking-off, rate build-ups, provisional and prime cost sums and the whole rate library. No sign-up, no card. You cannot export the bill.

Start 2 projects free
Pro licence — one-time
$59

One authorised user, up to 3 devices. Unlimited projects, client-ready PDF and CSV export, on-screen measurement, AI assistance, core updates to version 1.x.

Buy Pro — $59
Team pack — one-time
$199

Up to 5 authorised users and 10 devices on one shared licence key. Everything in the Pro licence. Each person works on their own projects; there is no simultaneous collaborative editing.

Buy Team — $199

On the price: Charged in US dollars. This page shows the Global price because you are reading the Global page, and both buttons open the Global product — nothing here is chosen from your IP address. Other regions, and the region selector, are on the pricing page. The amount you pay is the amount shown at checkout before you confirm. What a United Kingdom card sees: this product carries a real GBP price rather than a conversion, so you are charged £49 for the Pro licence and £189 for the Team pack. Confirmed against the checkout on 2 September 2026.

Before you invest an afternoon

What BillMate does not do.

AI drafts; the surveyor verifies.
Every AI-generated rate is marked on screen and counted on the exported document. An AI rate is a starting point for your judgement, never a verified market price.
On-screen measurement works on an image, not a file.
Load a photo, screenshot or exported page of the drawing and set the scale from one known dimension. BillMate does not read PDFs or CAD files directly, and there is no BIM or IFC model take-off. If your work is model-led, you need a package built for that.
Your data lives on your device.
There is no cloud copy. If the device is lost, the projects are lost with it. BillMate reminds you to back up after 14 days; take the reminder seriously.
No synchronisation between devices.
Devices on one licence do not share projects automatically. You move work with a backup file. Rate libraries merge on restore rather than overwrite.
Not an enterprise system.
There is no multi-user editing, no procurement workflow, no valuations module and no ERP integration. It is a tool for one surveyor at a time.
Choose your market Sets the currency, the terminology and the measurement standard shown to you. Nothing is chosen for you from your IP address, and you can always read the global pages.

Every market above has a page of its own, and two of them say plainly that no national method of measurement ships for them — see what "localised" means here.

Price something you have already priced, and compare.

2 projects free, no sign-up, and the whole rate library included.