MarketSouth Africa
StandardASAQS SMM
CurrencyZAR (R)
Free tier2 projects

Prepare an ASAQS bill in rand, on your own machine

The ASAQS trades ship as a template. Take off walls off a plan, build a rate that carries the generator as well as the bricklayer, price preliminaries in the three parts a JBCC bill adjusts them in, and issue the document — offline, for one payment.

No sign-up for the free tier. No sales call, no procurement cycle, and no renewal date.

The short answer

The established South African measurement and bill-production packages are good, and the larger practices already run them. If your work is drawing-led measurement at volume, buy one — we say so on the comparison page.

BillMate is for the rest of it: the sole practitioner, the two-partner practice, the contractor's estimator pricing a bill that arrived as a PDF. It turns a measure you already have into a properly structured trade bill, in rand, without an annual per-seat renewal — and it keeps working through a four-hour outage, because it does not need the internet and neither does your laptop battery.

What ships for South Africa
ASAQS Standard System template17 trades
AI instructed in the selected standardYes
RandSupported
Tax line on the summaryVAT, at the rate you set
Works through an outageEverything but the AI
LicenceR699 once, 3 devices

A South African bill is organised by trade, and that is not cosmetic

The Standard System of Measuring Building Work, published by the Association of South African Quantity Surveyors, has a strong trade orientation, and a South African bill has a recognisable shape because of it: Earthworks, then Concrete and formwork, then Masonry, then Roof coverings, and so on down the 17 trades.

That shape matters commercially, not just editorially. A trade bill is the document a subcontractor prices — you send the masonry contractor Bill No. 3 and nothing else, and the numbers that come back are directly comparable between tenderers because everyone priced the same trade in the same order. An elemental cost plan cannot be cut up that way, which is why the two documents coexist rather than compete.

What BillMate will not claim. It does not check your measurement against the Standard System, and it holds no library of standard ASAQS descriptions. It structures and prices the bill; the measurement, the preambles and the responsibility stay with the surveyor. The full position.

Preliminaries

Priced in three parts, because that is how they get adjusted.

The most South African thing about a South African bill. A blanket percentage cannot survive a variation order or an extension of time; a three-way split can, because each part moves for a different reason.

Preliminaries priced in three parts: the fixed charge, the value-related charge and the time-related charge, with the basis of each and the total.
Preliminaries item Basis Fixed Value-related Time-related
Site establishment, setting up and removal on completion Once R186,000
Site offices, stores and ablutions — erect and dismantle Once R64,000
Contract insurances, guarantees and construction guarantee 1.35% of value R116,775
Contractor's site staff and supervision R42,500 / month R382,500
Site offices, stores and ablutions — running costs R9,800 / month R88,200
Water, electricity and standby generation R14,200 / month R127,800
Security, hoarding and protection of the works R11,500 / month R103,500
Small plant, tools and scaffolding R8,600 / month R77,400
Carried to the summaryR1,146,175, or 13.25% of the contract value R250,000 R116,775 R779,400

Illustrative preliminaries for a R8,650,000 contract over 9 months, 25 August 2026 — an illustration of the structure, not a benchmark. Every figure is calculated from the contract value and the programme rather than typed, so changing the period moves the time-related column and nothing else, which is exactly the point. Why it is split: the fixed charge is incurred once whatever happens — you establish the site and you take it away again. The value-related charge follows the contract sum, so a variation that adds work adds insurance and guarantee cost with it. The time-related charge follows the programme, so an extension of time entitles the contractor to more site staff, more security and more generator diesel, and to none of the other two. Priced as one lump at 13.25%, none of those adjustments can be made honestly by either side.

Taking-off

Walls off a plan, on the centre-line girth.

You rarely have elevations when you need the wall quantity. You do have a plan, a perimeter and a storey height — and the girth adjustment that turns the first into a measurable length.

One-brick (220 mm) external walls in stock bricks — item 3.01
Dimension sheet: timesing, dimensions, squared quantity and description for each measurement.
Times Dimensions Squaring Description
  41.12
2.85
117.19 External walls, storey height, floor level to underside of roof. Centre-line girth 41.12 — the external perimeter of 42.00 less four corners at one wall thickness each, which is the adjustment a rectangle always takes.
5/ 1.50
1.20
9.00 Deduct five window openings, 1500 × 1200. Timesing 5/ — one measurement, five identical openings.
  2.40
2.10
5.04 Deduct the sliding door opening to the patio.
  0.90
2.10
1.89 Deduct the front door opening.
Cast into the bill 101.26

The first line is the one worth reading twice. An external perimeter of 42.00 is not the length of the wall — measured on its centre line a rectangle loses one wall thickness at each of its four corners, so 42.00 becomes 41.12 before anything is multiplied by anything. Get that wrong and every masonry quantity in the bill is wrong by about two per cent, in the direction that favours the contractor. The sheet keeps the working, so six months later the query is answered by opening it rather than by measuring the job again. The full walkthrough, including measuring on screen from an image of the drawing.

A rand rate, built

The arithmetic behind one square metre of wall.

Two of these lines would not appear in a European build-up at all. They are not padding — they are what the work actually costs here.

One-brick (220 mm) wall in clay stock bricks, class II mortar — unit rate per m²
Unit rate build-up for One-brick (220 mm) wall in clay stock bricks, class II mortar: constituent, quantity, unit, unit cost and amount, with percentage additions.
Constituent Quantity Unit Cost Amount
Material Clay stock bricks — 110 per m², including 5% breakage 115.50 nr R2.35 R271.43
Material Cement, 42.5N, for mortar — including 10% waste 0.34 bag R118 R40.12
Material Building sand, screened 0.06 R420 R25.20
Material Brickforce, built in every fourth course 1.60 m R6.80 R10.88
Labour Bricklayer — lay, joint and point 2.00 hr R42 R84
Labour Labourer — mix mortar, load out and move scaffold 2.20 hr R28 R61.60
Plant Mortar mixer — hire and fuel 0.25 hr R34 R8.50
Plant Standby generator and diesel — load-shedding allowance 1.00 item R9.40 R9.40
Plant Tubular scaffold — hire, erect and strike, apportioned 1.00 R18.50 R18.50
Net costR529.63
Overheads and establishment charges, 10%R52.96
Profit and risk, 15% on net cost plus overheadsR87.39
Unit rate per m²R669.98

Illustrative constituent costs for Johannesburg, 25 August 2026. These are an illustration of the method and are not current market prices — re-price every line against your own suppliers before use. BillMate's default 10% overheads and 15% profit are applied here; because the preliminaries above are priced separately, they are correctly absent from this rate.

The load-shedding allowance is a real cost and it belongs where a checker can see it, not buried in the labour rate. A mixer that stops mid-batch wastes the batch; a site that cannot run tools for four hours pays the gang anyway. Some surveyors carry it in preliminaries as part of standby generation instead — that is a defensible choice, and the only indefensible one is carrying it in both places. The scaffold line is here for the same reason: it is apportioned per square metre and shown, rather than smeared across the trade. Whichever way you decide, decide it once and write it into your preambles.

What comes out

The trade bill, in rand.

Continuous with everything above it: item 3.01 carries the quantity the dimension sheet cast and the rate the build-up arrived at.

Bill no. 3 — Masonry, extract
Proposed four-bedroom dwelling, Midrand, Johannesburg — ASAQS Standard System
Item Description Unit Qty Rate Amount
3.01 One-brick (220 mm) walls in clay stock bricks in class II mortar; external walls, storey height 101.26 R669.98 R67,842.17
3.02 Half-brick (110 mm) walls in clay stock bricks in class II mortar; internal partitions 168.40 R384.50 R64,749.80
3.03 Extra over one-brick walls for face brickwork externally, pointed with a weathered joint 74.60 R246 R18,351.60
3.04 Damp-proof course, 375 micron embossed polyethylene, 220 mm wide, built in horizontally m 88.40 R58.60 R5,180.24
3.05 Building in standard pressed steel door frames, 813 × 2032 mm, including filling frame solid nr 14 R186 R2,604
3.06 Precast concrete sills, 220 × 75 mm, bedded, jointed and pointed in cement mortar m 26.40 R214 R5,649.60
3.07 Provisional sum for engineering brickwork below damp-proof course, to be expended as directed sum 1 R68,000 R68,000
Carried to collection R232,377.41
From your rate library AI estimate — verify before issue Keyed by hand

Illustrative project and illustrative rates. Item 3.03 is measured extra over — the face brickwork is not a separate wall, it is the difference between the wall already measured and the better one actually built, which is why the rate looks small next to 3.01 and why measuring it as a full wall would double-count the structure. One rate in this extract is an AI draft and is marked as one, on screen and on the exported document, which also counts them. The same page for three markets.

Cities

A Johannesburg rate is not a Cape Town rate.

Haulage from the brickworks, labour availability, site access and the local subcontract market differ enough across the country that a single national rate is a fiction. BillMate records the location on every rate.

Johannesburg and TshwaneThe deepest subcontract market in the country and the shortest haul from most brickworks and readymix plants, which usually shows up as the lowest material component and the most competitive trade prices.
Cape TownConsistently the most expensive metro to build in — constrained sites, longer hauls for cement and brick, wind days that cost you crane and scaffold time, and a labour market that prices accordingly.
Durban and eThekwiniCoastal exposure changes the specification before it changes the rate: galvanising, corrosion cover and waterproofing all move, so a Durban rate and an inland rate are often not even the same item.
Gqeberha and East LondonThinner subcontract markets, so fewer tenderers and more volatility between them. Prices track the metros with a haulage differential — precisely the thing a dated, located rate captures and a national average destroys.

General observations about how these markets differ, not price data. BillMate publishes no South African rate index — your library is the price basis, and we explain why.

Your rates, kept straight

Every rate knows its city, its month and where it came from.

A South African rate library, working extract
Rate library extract: description, unit, rate, location, month priced, source and currency status.
Description Unit Rate Location Priced Source Status
One-brick (220 mm) walls in clay stock bricks, class II mortar R669.98 Johannesburg — Midrand 2026-06 Own build-up Current
Ditto, same specification R724.40 Cape Town 2026-05 Priced tender Current
Half-brick (110 mm) walls in clay stock bricks R384.50 Johannesburg — Midrand 2026-06 Priced tender Current
Extra over one-brick walls for face brickwork, weathered joint R246 Durban 2026-04 Subcontract quote Current
Precast concrete sills, 220 × 75 mm, bedded and pointed m R214 Johannesburg — Midrand 2026-06 AI draft Unverified
Structural steelwork, universal beams, fabricated and erected t R34,800 Gqeberha 2024-11 Priced tender Stale

Two entries here are the same wall specification priced in different cities, and they sit side by side rather than averaging into a number that is true nowhere. One is an unverified AI draft and says so. One is flagged stale at 12 months — and a 2024 steel rate is exactly the kind of figure that will lose you money quietly. Illustrative rates, not market evidence — how the library works.

Be realistic about this

Where BillMate fits a South African practice, and where it does not.

A good fit

  • Sole practitioners and small practices who cannot justify a per-seat annual licence in rand, and whose alternative today is a spreadsheet that breaks on the third revision.
  • Contractors’ and subcontractors’ estimators pricing a trade bill that arrived as a PDF, who need build-ups that survive a post-tender interview.
  • Anyone who already measures elsewhere and needs the billing, pricing and issuing end of the job.
  • Practices working into the rest of the continent — a rand project, a naira project and a shilling project on one install, with nothing converted between them.
  • Working through an outage. Everything except the AI runs with no connection at all, which in this market is a feature rather than a boast.

A poor fit

  • Drawing- and model-led measurement at volume. BillMate measures from an image of a drawing, not from a PDF, a CAD file or an IFC model. If that is the core of the job, buy a measurement package.
  • Contract price adjustment. There is no CPAP or Haylett formula calculation, and no index tracking. BillMate dates a rate and warns you when it is stale; it does not compute an adjustment.
  • JBCC contract administration. No payment certificates, no valuations, no variation register, no final account. It prepares documents; it does not administer contracts.
  • Published cost data. Nothing bundled, for this market or any other. Your rates or nothing.
  • Multi-surveyor teams editing one live bill. Projects live on the device that made them, and there is no synchronisation.
What it costs

R699 once, or nothing at all for 2 projects.

No subscription, no renewal date, no per-seat fee and no sales call.

Free
R0

2 active projects. Taking-off, rate build-ups, provisional and prime cost sums and the whole rate library. No sign-up, no card. You cannot export the bill.

Start 2 projects free
Pro licence — one-time
R699

One authorised user, up to 3 devices. Unlimited projects, client-ready PDF and CSV export, on-screen measurement, AI assistance, core updates to version 1.x.

Buy Pro — R699
Team pack — one-time
R2,499

Up to 5 authorised users and 10 devices on one shared licence key. Everything in the Pro licence. Each person works on their own projects; there is no simultaneous collaborative editing.

Buy Team — R2,499

On the price: Charged in rand at Selar checkout. This page shows the South Africa price because you are reading the South Africa page, and both buttons open the South Africa product — nothing here is chosen from your IP address. Other regions, and the region selector, are on the pricing page. The amount you pay is the amount shown at checkout before you confirm. On VAT: BillMate does not know your tax position and does not work it out — you set the label and type the rate, and it is applied to the sub-total after preliminaries and contingency. Confirm the rate that applies to your contract rather than trusting a default.

Before you invest an afternoon

What BillMate does not do.

AI drafts; the surveyor verifies.
Every AI-generated rate is marked on screen and counted on the exported document. An AI rate is a starting point for your judgement, never a verified market price.
On-screen measurement works on an image, not a file.
Load a photo, screenshot or exported page of the drawing and set the scale from one known dimension. BillMate does not read PDFs or CAD files directly, and there is no BIM or IFC model take-off. If your work is model-led, you need a package built for that.
Your data lives on your device.
There is no cloud copy. If the device is lost, the projects are lost with it. BillMate reminds you to back up after 14 days; take the reminder seriously.
No synchronisation between devices.
Devices on one licence do not share projects automatically. You move work with a backup file. Rate libraries merge on restore rather than overwrite.
Not an enterprise system.
There is no multi-user editing, no procurement workflow, no valuations module and no ERP integration. It is a tool for one surveyor at a time.
Choose your market Sets the currency, the terminology and the measurement standard shown to you. Nothing is chosen for you from your IP address, and you can always read the global pages.

Every market above has a page of its own, and two of them say plainly that no national method of measurement ships for them — see what "localised" means here.

Price a trade you have already priced, and compare.

2 projects free, no sign-up, and the whole rate library included.